Tel: 67488894   Email:
 
No products in the cart.

Other Courses

Work Measurement, Standard Costing & Manpower Planning For Developing Lean Solution
No. Course Title No of Days I (Int’l) L(local) In-house[H] Public[P] Consulting[C]
1 MTM-1 7 I HP
2 MTM-2 5 I HP
3 Mini-MOST® 4 I HP
4 Basic-MOST® 4 I HP
5 Maxi-MOST® 4 I HP
6 Admin-MOST® 4 I HP
7 Operational Service Cost Estimation
(Application & Implementation)
6 to 20 - C
8 Certified Productivity Manager 5 L HP
9 Process Standard Cost Estimation
(Application & Implementation)
6 to 20 - C
10 Manpower Planning For Budgetary Control
For Large Service Engineering &
Manufacturing Operations
30 to 90 - C
Value Engineering Analysis, Cost Improvement Management & Innovation
No. Course Title No of Days I (Int’l) L(local) In-house[H] Public[P] Consulting[C]
11 Value Engineering Analysis 3 L HP
12 Quality Function Deployment 1 L HP
13 Cost Improvement Management 2 L HP
14 Value Engineering & Cost Reduction 5 - HP
15 Supply Chain Value Engineering 6 to 20 - C
16 TRIZ Design Innovation 2 - HP
TRIZ Innovation, Design, Process Problem Solving Methodology
No. Course Title No of Days I (Int’l) L(local) In-house[H] Public[P] Consulting[C]
17 TRIZ Innovation 2 L HP
18 Root Cause Problem Solving 2 L HP
19 Failure Mode & Effect Analysis (FMEA) 2 L HP
20 8D Problem Solving Method 2 L HP
21 IE Kaizen For Supervisor 3 - HP
22 7 New QC Tools 2 - HP
23 Reducing Process Variation 2 - HP
24 Mistake Proofing 2 - HP
25 TWI Process Mastering 3 - HP
Lean, Pull System, Kanban & Value Stream Mapping
No. Course Title No of Days I (Int’l) L(local) In-house[H] Public[P] Consulting[C]
26 Lean Manufacturing 2 L HP
27 Lean Office 2 L HP
28 Lean Value Stream Mapping 2 L HP
29 Lean Process Mapping 2 L HP
30 Certified Lean Manager (for Manufacturing) 5 L HP
31 Certified Lean Leaders (for Manufacturing) 5 L HP
32 Certified Lean Leaders (for Healthcare) 5 L HP
33 Certified Lean Leaders (for Services) 5 L HP
34 Pull Kanban System 2 L HP
35 Kaizen Production For Set-up Reduction 2 L HP
36 New Product Standard Cost Estimation 5 to 20 - C
37 New Product Line Design 5 to 20 - C
38 5S Facilitator Training 3 L HP
39 Lean Operator Training 3 L HP
40 Production Cell Line Design For High Mix & Low Volume 5 to 20 - C
Total Productive Maintenance & Equipment Management
No. Course Title No of Days I (Int’l) L(local) In-house[H] Public[P] Consulting[C]
41 TPM For Management 1 L HP
42 TPM Autonomous Control 2 L HP
43 TPM OEE Kaizen 2 L HP
44 TPM Planned Maintenance 2 L HP
45 PM Analysis 2 L HP
46 TPM Flow Loss Analysis of OEE & OPE 2 L HP
47 Preventive & Predictive Maintenance 2 L HP
48 Reliability Based Maintenance 3 L HP
49 Equipment Failure Trouble-shooting 3 L HP
50 Certified TPM Manager 5 L HP
Lean Six Sigma Certification, Quality Systems & Operational Business Excellence
No. Course Title No of Days I (Int’l) L(local) In-house[H] Public[P] Consulting[C]
51 Shingo Operational Excellence 2 L H
52 Lean Six Sigma (Green Belt) 6 to 10 IL H
53 Lean Six Sigma (Black Belt) 12 to 20 IL H
54 Lean Six Sigma (Yellow Belt) 5 IL H
55 Lean Six Sigma For Management (Manufacturing / Services) 2 IL H
56 Process Quality Measurement 2 IL H
57 SPC – Short Run 3 IL H
58 Process Capability Study 2 IL H
59 Design Of Experiments 3 IL H
60 Quality Diagnostics 2 IL H
61 Mini-Tab Quality Application 3 IL H
62 Mini-Tab Advanced Quality Application 5 IL H
63 HAZOP Risk Management 2 IL H
64 Manufacturing Outsourcing & Supply Chain Management 2 IL H
65 Practical Reliability 3 IL H
66 Process Planning, Control & Management 2 IL H
67 Quality Function Deployment 2 IL H
68 Team Based Management 2 IL H
69 Six Sigma Management 2 IL H
70 Supply Chain Management 2 IL H
71 Creative Statistical Management 2 IL H
72 Practical Statistical Problem Solving Method 2 IL H
73 The Six Sigma Measurement Statistics 2 IL H
74 Organization Change Process 2 IL H
75 The Creative Organization 2 IL H
76 Project Planning & Management 2 IL H
77 Basic Practical Business Statistical Application 2 IL H
78 The Quality Improvement Process 2 IL H
79 The Value Stream Mapping Methodology 2 IL H
80 Automatic ID & RFID Tracking System 3 IL HC
81 Product Profit Contribution Analysis - - C
82 TPM Plant-wide Implementation - - C
83 Standard Cost Development - - C
84 Manpower Planning & Budgetary Control - - C
85 Product Costing & Estimating System - - C
86 Lean Value Stream Implementation - - C